Bond Street Site Assistance Works

Project Includes:

  • Intrusive Survey
  • Dilapidation Survey of existing CMS
  • Load Monitoring of existing supplies
  • Electrical Design
  • Construction of new Fire Node Enclosure
  • Installation of new CMS and interfacing with CRL subcontractor
  • Installation of control panels, power supplies and CMS in Station Control Room
  • Installation of new power supply to Fire Node
  • Installation of new lighting to Node Area in ventilation shaft
  • Installation of new handrail to Node Area in ventilation shaft
  • Installation of temporary hoarding & signage
  • Making good of all areas, tiling and redecoration of the SOR
  • Carry out builders clean at end of the works
  • Testing & Commissioning of new installation

The project was presented with a Beacon Award for excellence in HSE performance. Solution Rail were main contractor on the these works.

Client

TfL – LUL

i

Contract

Bond Street Site Assistance Works

Service

Electrical, Fire

Contact Us:

Tel: +44 (0)1923 773 252

E-mail: enquiries@solutionrail.co.uk