LV Renewals Phase 3 – Royal Albert, Shadwell & Poplar Stations

LV Renewals Phase 3 – Royal Albert, Shadwell & Poplar Stations

LV Renewals Phase 3 – Royal Albert, Shadwell & Poplar Stations As part of the LV Renewals Phase 3 project, Solution Rail are undertaking the following; Replacement of existing lighting with new LED lighting at Shadwell Station including a new lighting control...
Newbury Park Step Free Access

Newbury Park Step Free Access

Newbury Park Step Free Access As part of the TfL Step Free Access programme, we carried out the Communication and Mechanical works at Newbury Park Station. The communications package included installation of; CCTV Cameras PHP / EVC systems Lift Intercom Interface...
Farringdon Sidings Tag & Trace

Farringdon Sidings Tag & Trace

Farringdon Sidings Tag & Trace The interior of a large enclosure (constructed by others) that covered two thirds of the length of Road 38 in the Main Shed at Ruislip Depot required heating internally. This was to raise the ambient temperature within the enclosure...
Ruislip Depot – Train Refresh Enabling

Ruislip Depot – Train Refresh Enabling

Ruislip Depot – Train Refresh Enabling In order for LUL to refresh the Central Line rolling stock fleet ahead of the Olympics, extensive enabling works were required in the Cleaning Shed at Ruislip Depot where the bulk of the refresh works were to be undertaken....
C660 LU Crossrail Interface Works

C660 LU Crossrail Interface Works

C660 LU Crossrail Interface Works As part of the Crossrail Interface works, Solution Rail undertook the following; Installation of a UPS, Isolator, CMS and Cabling at Bond Street, Farringdon, Barbican, Moorgate, Tottenham Court Road at Paddington. Installation of new...