Farringdon Sidings Tag & Trace

Farringdon Sidings Tag & Trace

Farringdon Sidings Tag & Trace The interior of a large enclosure (constructed by others) that covered two thirds of the length of Road 38 in the Main Shed at Ruislip Depot required heating internally. This was to raise the ambient temperature within the enclosure...
Ruislip Depot – Train Refresh Enabling

Ruislip Depot – Train Refresh Enabling

Ruislip Depot – Train Refresh Enabling In order for LUL to refresh the Central Line rolling stock fleet ahead of the Olympics, extensive enabling works were required in the Cleaning Shed at Ruislip Depot where the bulk of the refresh works were to be undertaken....
C660 LU Crossrail Interface Works

C660 LU Crossrail Interface Works

C660 LU Crossrail Interface Works As part of the Crossrail Interface works, Solution Rail undertook the following; Installation of a UPS, Isolator, CMS and Cabling at Bond Street, Farringdon, Barbican, Moorgate, Tottenham Court Road at Paddington. Installation of new...
Oxford Circus – DNO Power Supply Changeover

Oxford Circus – DNO Power Supply Changeover

Oxford Circus – DNO Power Supply Changeover The existing 185mm2 4core SWA DNO (emergency) power supply from the street to Oxford Circus station was disconnected and replaced with a 150mm2 4 core SWA supply from a new local DNO transformer (installed by others)....